학술논문

Beam commissioning of the SPS LSS6 extraction and TT60 for LHC
Document Type
Conference
Source
2007 IEEE Particle Accelerator Conference (PAC) Particle Accelerator Conference, 2007. PAC. IEEE. :1610-1612 Jun, 2007
Subject
Fields, Waves and Electromagnetics
Engineered Materials, Dielectrics and Plasmas
Nuclear Engineering
Robotics and Control Systems
Large Hadron Collider
Magnets
Extraterrestrial measurements
Particle beam injection
Instruments
Protection
Particle beams
Particle beam measurements
Control systems
System testing
Language
ISSN
1944-4680
2152-9582
Abstract
The new fast extraction system in LSS6 of the SPS and the first 100 m of transfer line TT60 was commissioned with low intensity beam in late 2006. The layout and functionality of the main elements are briefly explained, including the various hardware subsystems and the control system. The systems safety procedures, test objectives and measurements performed during the beam commissioning are described.