학술논문
Performance of antiproton injection and extraction transfer lines of the Recycler Ring at Fermilab
Document Type
Conference
Author
Source
Proceedings of the 2003 Particle Accelerator Conference Particle accelerator conference Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the. 3:1649-1651 vol.3 2003
Subject
Language
ISSN
1063-3928
Abstract
The Recycler Ring, an 8 GeV antiproton accumulator, is being commissioned at Fermilab. Antiproton transfers in and out of the Recycler Ring take place through two transfer lines connecting the Recycler to the Main Injector. Transfer line layout and operation of beam transfers will be described. Particular attention has been paid to injection mismatch effects, in order to limit emittance growth during transfers. A considerable improvement has been achieved by removing vacuum windows, previously present in both transfer lines.