Risk-Informed Prediction of Dredging Project Duration Using Stochastic Machine Learning
Document Type
Report
Source
Water. June, 2020, Vol. 12 Issue 6
Subject
Taiwan
Language
English
ISSN
2073-4441
Abstract
Dredging engineering projects are complex because they involve greater uncertainty from the natural environment, social needs, government policy and many stakeholders. Engineering companies submit tenders that draw on similar cases undertaken in recent years. However, weather, earthquakes, typhoons and other disasters often change landforms. Therefore, evaluating the duration of dredging projects with reference to only a few previous cases is inadequate, often leading to an unnecessarily long construction duration if the scope of the project is not clearly defined at the early phase. The goal of this investigation aimed to estimate project duration at the beginning of construction and the probability of risk. Evolutionary machine learning was used to build a deterministic model of dredging project duration. Monte Carlo simulation was then utilized to establish the probabilistic distribution of the project duration based on historical patterns. The analytical outputs are displayed through a graphical user interface that provides project coordinators with a means of assessing the uncertainty of project duration in the initial phase of the project. This study will provide a practical reference for contractors and the Water Resources Agency. Keywords: dredging engineering project; project planning and management; duration estimation; machine learning; metaheuristic optimization; Monte Carlo simulation
1. Introduction The Central Mountain Range in Eastern Taiwan has a high altitude and steep slopes. Thus, most rivers in Taiwan are short, torrential, have strong scouring forces and flow [...]