학술논문

High-precision performance testing of the LHC power converters
Document Type
Conference
Source
2007 IEEE Particle Accelerator Conference (PAC) Particle Accelerator Conference, 2007. PAC. IEEE. :320-322 Jun, 2007
Subject
Fields, Waves and Electromagnetics
Engineered Materials, Dielectrics and Plasmas
Nuclear Engineering
Robotics and Control Systems
Large Hadron Collider
System testing
Manufacturing industries
Production facilities
Industrial control
Superconducting magnets
Automatic testing
Electronic equipment testing
Transducers
Electrical equipment industry
Language
ISSN
1944-4680
2152-9582
Abstract
The magnet power converters for LHC were procured in three parts, power part, current transducers and control electronics, to enable a maximum of industrial participation in the manufacturing and still guarantee the very high precision (a few parts in 10 -6 ) required by LHC. One consequence of this approach was several stages of system tests: factory reception tests, CERN reception tests, integration tests, short-circuit tests and commissioning on the final load in the LHC tunnel. The majority of the power converters for LHC have now been delivered, integrated into complete converters and highprecision performance testing is well advanced. This paper presents the techniques used for high-precision testing and the results obtained.