Test results of a 7.5 kA semi-conductor prototype switch as modular switchgear in energy extraction systems for the HL-LHC magnet test facility
Document Type
Conference
Source
2016 IEEE International Power Modulator and High Voltage Conference (IPMHVC) Power Modulator and High Voltage Conference (IPMHVC), 2016 IEEE International. :514-519 Jul, 2016
Subject
Components, Circuits, Devices and Systems
Engineered Materials, Dielectrics and Plasmas
Power, Energy and Industry Applications
Insulated gate bipolar transistors
Snubbers
Capacitors
Switches
Superconducting magnets
Transient analysis
Resistors
Energy Extraction
Magnet Protection
DC breaker
Language
Abstract
The superconducting magnets, intended for use in the LHC High Luminosity (HL-LHC) project at CERN are based on Nb3Sn technology. Powering of prototypes of such magnets with up to tens of kilo-Amperes is required for detailed studies of the quench behavior as well as an evaluation of the associated magnet protection equipment. For this purpose an ultra-fast energy extraction system is needed in order to prevent any overheating of the magnet conductors during the quench process. No commercially available opening switch is capable of rupturing a DC current of 30 kA in a solely inductive circuit, within one millisecond and under development of up to 1 kV. This has been the incentive for undertaking the development of such a switch. The choice was to use high-current IGBT's as static switches. This paper presents the arguments for the different choices of topologies and component selections for the 7.5 kA basic module of which four units are composing the final 30 kA switch. Specific features related to the design, the compensation techniques and the thermal considerations are highlighted. In particular, this paper describes a detailed presentation and analysis of all test results from type testing of the first module, including a comparison with the design phase calculations and the simulation results.