학술논문

Commissioning Challenges for Upgrading Gas Turbines to Combined Cycle
Document Type
Periodical
Source
IEEE Transactions on Industry Applications IEEE Trans. on Ind. Applicat. Industry Applications, IEEE Transactions on. 60(3):5202-5210 Jun, 2024
Subject
Power, Energy and Industry Applications
Signal Processing and Analysis
Fields, Waves and Electromagnetics
Components, Circuits, Devices and Systems
Turbines
Loading
Couplings
Valves
Mathematical models
Oils
Boilers
Combined cycle
gas turbine
power management system
steam coupling
steam turbine
Language
ISSN
0093-9994
1939-9367
Abstract
This paper presents the challenges that were introduced during the commissioning of an upgrade of an existing oil field from a simple-cycle gas turbine to a combined-cycle gas turbine. The combined-cycle block consists of three gas turbines and one steam turbine from two manufacturers. The paper discusses the impact on processes during the upgrade and the main milestones of commissioning the steam turbine. New modes of running steam turbines that were introduced are compared with the existing gas turbines. The steam coupling between the gas turbine and steam turbine is verified during field tests. The impacts of the steam coupling on the existing generation control system and load-shedding system are explained. Modified steam equations were updated during commissioning. The updated automatic generator control philosophy is also highlighted. Actual field test results are presented in the paper.