학술논문

The Impact of Sluice Construction in the North Branch of the Changjiang Estuary on Saltwater Intrusion and Freshwater Resources
Document Type
article
Source
Journal of Marine Science and Engineering, Vol 11, Iss 11, p 2107 (2023)
Subject
numerical simulation
water transport
salt transport
salinity variation
estuarine projects
North Branch
Naval architecture. Shipbuilding. Marine engineering
VM1-989
Oceanography
GC1-1581
Language
English
ISSN
11112107
2077-1312
Abstract
Estuarine projects can quickly change the estuarine topography and influence the hydrodynamics and saltwater intrusion. The Changjiang Estuary is a multiple-bifurcation megaestuary, and the outstanding feature of the saltwater intrusion is the saltwater spillover from the North Branch (NB) into the South Branch (SB). In this study, the improved ECOM-si model was adopted to numerically experiment with the impact of the sluices that are planned for construction in the upper, middle, and lower reaches of the NB on the saltwater intrusion and freshwater resources. The simulation results show that, on the one hand, sluice construction can eliminate the saltwater spillover from the NB into the SB; on the other hand, sluice construction makes water enter the NB from the SB, and the runoff discharging into the sea in the SB decreases. The water intake time of the Qingcaosha Reservoir (QCSR) increases by 3.2 days for sluice construction in the upper reaches of the NB and decreases by 0.97 and 0.94 days for sluice construction in the middle and lower reaches of the NB, respectively. Considering the impact of sluice construction in the NB on the saltwater intrusion and freshwater resources, the construction of sluices in the upper reaches of the NB is recommended.