Heuristic Algorithm for a WIP Projection Problem at Finite Capacity in Semiconductor Manufacturing.
Document Type
Article
Source
IEEE Transactions on Semiconductor Manufacturing. Jan/Feb2018, Vol. 31 Issue 1, p62-75. 14p.
Subject
*HEURISTIC algorithms
*SEMICONDUCTOR manufacturing
*SEMICONDUCTOR industry
*DELIVERY of goods
*INTEGER programming
Language
ISSN
0894-6507
Abstract
In this paper, we propose a heuristic approach for fixing work-in-progress (WIP) projection issues in the semiconductor industry especially for high mix low volume facilities. The considered problem consists of estimating the start and end dates for each remaining process step of the production lots in the WIP and anticipating the fab loading taking into account the constraints of the maximum throughput of machines considered as capacity constraints and customer delivery commitments. The objective being to guarantee on-time delivery, we focus on minimizing the total weighted tardiness. We have formulated the problem into a mixed-integer programming and we have empirically shown its computational intractability. Due to the computational intractability using actual production data, a heuristic algorithm is proposed. It is an iterative finite capacity planning system that considers as inputs lots due dates and equipment capabilities and capacities. The performance of the heuristic is assessed using industrial instances. It turns out that it achieves targeted objectives with satisfactory results in terms of quality of the solution and computation time. [ABSTRACT FROM PUBLISHER]