학술논문

The ICRH System Planned for Wendelstein 7-X.
Document Type
Article
Source
AIP Conference Proceedings. 2005, Vol. 787 Issue 1, p246-249. 4p.
Subject
*STELLARATORS
*ELECTRON cyclotron resonance sources
*FERRITES
*MAGNETIC fields
*NEUTRAL beams
*IONS
Language
ISSN
0094-243X
Abstract
The Max-Planck Institute for Plasma Physics is presently building the stellarator experiment Wendelstein 7-X (W7-X) at Greifswald, Germany. First plasma operation in planned after 2010. The plasma will be heated primarily using electron cyclotron resonance heating (ECRH) at a magnetic field of B=2.5 T, but also using ion cyclotron resonance heating (ICRH) and neutral beam injection heating (NBI). The latter heating methods are necessary to study high beta discharges and fast ion confinement. The ICRF system is planned to consist of two radially movable antennas powered by two generators with an output power of 2 MW each. The antenna plasma load will be matched in real time to the generator impedance using ferrite loaded transmission line elements. In addition, 3dB couplers will passively protect the generators from RF power reflections during rapid changes of the antenna plasma load that are too fast for the ferrite matching system. © 2005 American Institute of Physics [ABSTRACT FROM AUTHOR]