학술논문

Minimizing the makespan and carbon emissions in the green flexible job shop scheduling problem with learning effects.
Document Type
Article
Source
Scientific Reports. 4/19/2023, Vol. 13 Issue 1, p1-15. 15p.
Subject
*PRODUCTION scheduling
*CARBON emissions
*MIXED integer linear programming
*FLOW shops
*MANUFACTURING processes
*SEARCH algorithms
Language
ISSN
2045-2322
Abstract
One of the most difficult challenges for modern manufacturing is reducing carbon emissions. This paper focuses on the green scheduling problem in a flexible job shop system, taking into account energy consumption and worker learning effects. With the objective of simultaneously minimizing the makespan and total carbon emissions, the green flexible job shop scheduling problem (GFJSP) is formulated as a mixed integer linear multiobjective optimization model. Then, the improved multiobjective sparrow search algorithm (IMOSSA) is developed to find the optimal solution. Finally, we conduct computational experiments, including a comparison between IMOSSA and the nondominated sorting genetic algorithm II (NSGA-II), Jaya and the mixed integer linear programming (MILP) solver of CPLEX. The results demonstrate that IMOSSA has high precision, good convergence and excellent performance in solving the GFJSP in low-carbon manufacturing systems. [ABSTRACT FROM AUTHOR]