학술논문

INJECTOR LINAC FOR THE BNL SUPER NEUTRINO BEAM PROJECT.
Document Type
Conference
Author
Source
Conference: PAC 05 PARTICLE ACCELERATOR CONFERENCE, KNOXVILLE, TN (US), 05/16/2005--05/20/2005; Other Information: PBD: 16 May 2005
Subject
43 PARTICLE ACCELERATORS ACCELERATORS
BNL
DESIGN
LINEAR ACCELERATORS
NEUTRINO BEAMS
NEUTRINOS
PROTON BEAMS
Language
English
Abstract
BNL plans to upgrade the AGS proton beam power from the present 0.14 MW to higher than 1.0 MW and beyond for a neutrino facility. We have examined possible upgrade to the AGS accelerator complex that would meet the requirements of the proton beam of 1.0 MW for neutrino superbeam facility. The major contribution for the higher power is from the increase of the repetition rate of the AGS from 0.3 Hz to 2.5 Hz, with moderate increase from the intensity. To increase the AGS repetition rate we are proposing to replace booster with a 1.5 GeV linac. We will replace part of existing 200 MeV linac with coupled cavity structure from 116 MeV to 400 MeV and then add an additional 1.1 GeV superconducting linac to reach a final energy of 1.5 GeV for direct H{sup -} injection into the AGS. We will present possible choices for the upgrade and our choice and its design.