학술논문

Quench Performance of the First Pre-Series AUP Cryo-Assembly
Document Type
Periodical
Source
IEEE Transactions on Applied Superconductivity IEEE Trans. Appl. Supercond. Applied Superconductivity, IEEE Transactions on. 34(5):1-4 Aug, 2024
Subject
Fields, Waves and Electromagnetics
Engineered Materials, Dielectrics and Plasmas
Superconducting magnets
Temperature measurement
Magnetic shielding
Magnetic noise
Heating systems
Magnetic tunneling
Electrical resistance measurement
Accelerator magnets
quadrupoles
++%24%5F3%24<%2Ftex-math>+<%2Finline-formula>+<%2Fnamed-content>Sn%22">Nb $_3$ Sn
quench
superconducting magnets
Language
ISSN
1051-8223
1558-2515
2378-7074
Abstract
The High Luminosity upgrade of the Large Hadron Collider (HL-LHC) at CERN will include eight cryo-assemblies that are expected to be fabricated and delivered to CERN by the US HL-LHC Accelerator Upgrade Project (AUP) as part of the U.S. contributions to the HL-LHC. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 and Q3 inner triplet optical elements in front of the two interaction points. Each cryo-assembly consists of two 4.2 m long Nb 3 Sn quadrupole magnets with aperture 150 mm and operating gradient 132.6 T/m. The first pre-series cryo-assembly has been fabricated and successfully tested at the horizontal test facility at Fermi National Accelerator Laboratory. In this manuscript we report the quench test results of the LQXFA/B-01 cryo-assembly. The primary objective of the horizontal test is full cryo-assembly qualification and validation of the performance requirements.