학술논문

曲线分幅共墩悬浇T构梁纵、横桥向不平衡控制方法 / The Control Method for Longitudinal & Transverse Unbalance of Curve-split Common Pier Suspended Sast T-structure Beam
Document Type
Academic Journal
Source
市政技术 / Municipal Engineering Technology. 42(1):60-67
Subject
大跨径连续梁
悬浇T构梁
配重
不平衡
齿块
等弯矩
有限元分析
long span continuous beam
cantilevered T-frame beam
counterweight
unbalance
tooth block
equal bending moment
finite element analysis
Language
Chinese
ISSN
1009-7767
Abstract
依托某特大桥主桥预应力混凝土连续刚构桥工程,对悬浇T构梁进行了受力分析,并分析了齿块荷载对主梁线形的影响,发现在大悬臂状态下,较小重量的齿块会对主梁产生较大力矩,且在监控计算中需要考虑预应力锚固齿块对主梁的影响;运用有限元分析方法计算出了不平衡力矩,再根据等弯矩配重原理给出了悬浇T构梁纵、横桥向的配重方案,并对横桥向的配重方案加以计算分析,验证了配重方案的可行性和准确性.
Based on the prestressed concrete continuous rigid frame bridge project of the main bridge of a large bridge,the force of the suspended cast T-frame beam is analyzed as well as the influence of tooth block load on the linear shape of the main beam.It is found that under the condition of large cantilever,the smaller weight of the tooth block will produce larger torque on the main beam.The influence of the prestressed anchor tooth block should be consid-ered in the monitoring calculation;The unbalance moment is calculated by the finite element method.According to the principle of equal bending moment,the counterweight scheme of the longitudinal and transverse bridge direction is given,and one of the transverse bridge direction is calculated and analyzed to verify the feasibility and accuracy.